UM HomeCME_header

For More Information

More information will be forth coming on the building plans, floor layout, and equipment as the planning processes

Facilities

The Center for Manufacturing Excellence is to be housed in a new building located between two of the buildings of the School of Engineering (Carrier Hall and Old Chemistry) on the Lyceum Circle. The 47,000-square-foot building will have three floors. The first floor will house a 12,000-square-foot “factory floor,” along with three classrooms; the other two floors will include office and meeting space for faculty and students. The factory floor will have a central assembly area and a final finishing area in addition to three main manufacturing lines: wood, plastic and metal.

Construction started on March 16, 2009 and is expected to be completed in late fall 2010.


UM Home | School of Engineering | School of Business | School of Accountancy
Copyright © 2008 The University of Mississippi