See individual team reports (Academic Structure, Student Administration, Student Accounting, Reporting, Web / Interfaces, Organizational Readiness, Technology Infrastructure) for additional detail.
HR SP 51-54
R/3 SP 33-34
BASIS SP 34-35
Application Interface SP 34-35
HR Public Sector (HRPS) Patch 12, 13
Campus Management Patches 5, 6
BSI TUBs 150-160
The next upgrade cycle will start 10/18 on DEV. CRT 7 will be included with this cycle.
Work continues on Biller Direct.
The server that will be used as part of the data exchange infrastructure has been installed. Information is being collected in regard to data types, sizes, formats, and structures before the completion of file system and database setup.